Home » Over the years ~ supporting customers in UAE
Over the years ~ supporting customers in UAE
Descon Automation Control System LLC Timeline in UAE
2022
Design, Supply, Installation, Testing and Commissioning Including all Construction Activities for 3Nos Surge Vessel System at Jebel Ali Power Station SWRO Pumping Station
2022
Supply of TD-120 Oil In Water Analyzer to Dubai Electricity & Water Authority (DEWA), I&C Maintenance in Generation Station
2021
Supply of WQA System panels under EtihadWE CONTRACT NO.: 167W2020 Transmission Pipelines 2XDN1800 CS from UAQ New 150MIGD RO Plant to Khuraijah New WDC – RAK
2020
Federal Electricity and Water Authority awards “FEWA Contract 2 (151W/2019)” to Descon Automation Control System; SUPPLY OF SMART WATER METERS FOR AMI ROLL OUT – a five year contract.
2019
I&C Sub-Contract works for Water Supply System Upgrade : CCR141 (WR-44 & 45)
2018
Signed another Contract with FEWA to supply Smart Electronic Water Meters (Wireless)
2017
May 2017
Secured the Contract 105W for Supply of Smart electronic Water Meters to Federal Electricity & Watter Authority (FEWA)
April 2017
Received Letter Of Intent for Supply and Installation of Sector Measuring Points in Eastern Region (Abu Dhabi)Project D103593.1
2016
Descon Automation Control System LLC was chosen as System Builder and I&C contractor for new plant facilities of Lube Oil Manufacturing Company in Sharjah
2015
Conducted the Middle Eastern Service Training for Turner Designs Hydrocarbon Instruments Inc (USA) for complete dealers in the region. Training / workshop was conducted in Descon Automation Control System LLC facilities.
2014
Becoming independent entity as I&C contractor and Approved Non OEM panel builder in ADWEA Group
2013
Appointed as Distributor of Turner Designs Hydrocarbon Instruments Inc (USA)
2012
Qualified as OEM partners of ABB in RTU560 series
2011
Working together with O&G companies in tank guaging projects in Fujairah region
2010
Tank Guaging System project for El Merk Algeria along with Endress+Hauser
2009
Completing the SCADA / Gateway RTU project for Hatta Reservoir
2008
Qualified into DEWA RTU integration projects with supply of two segments of Pipeline Monitoring RTUs
2007
Taking part in Automation of “State Of the Art” Blending Facility for reputed Lube Oil Manufacturing company in Sharjah
2006
Secure the largest value Single Order Contract from FEWA in Substation Automation of 132kV Substations in Northern Emirates
2005
Qualifies as OEM Partner with ABB for RTU family in Substation Automation Domain
2004
Making an Entry into Substation Automation for 33kV Substations in Northern Emirates
2003
Selling UltraSonic Flowmeters for Crude Oil Loading Arms in Qatar
2002
Executes the PILOT project of Automatic Water Tanker Filling Station at Madinat Zayed Abu Dabi
2001
Implemented Automation of Lube Oil Blending Process with Modicon Controller and MageLis HMI
2000
Taking part in Oil & Gas segment as I&C Sub contractor
1999
Secure the Distribution Control System Contract (MEW Bahrain) outside UAE
1998
Successful in taking part of Observation and Augmentation of Water Well Head Control System in Al Ain
1997
Secures the single largest Supply Contract (WD40) for Water Network
1996
Formation of Descon Trading LLC with office in Dubai
1995
Establishing office in Abu Dhabi Emirate
1994
Descon Trading Establishment starts operation in UAE during April 1994.