Home » Over the years ~ supporting customers in UAE

Over the years ~ supporting customers in UAE

Descon Automation Control System LLC Timeline in UAE

2022

Design, Supply, Installation, Testing and Commissioning Including all Construction Activities for 3Nos Surge Vessel System at Jebel Ali Power Station SWRO Pumping Station

2022

Supply of TD-120 Oil In Water Analyzer to Dubai Electricity & Water Authority (DEWA), I&C Maintenance in Generation Station

2021

Supply of WQA System panels under EtihadWE CONTRACT NO.: 167W2020 Transmission Pipelines 2XDN1800 CS from UAQ New 150MIGD RO Plant to Khuraijah New WDC – RAK

2020

Federal Electricity and Water Authority awards “FEWA Contract 2 (151W/2019)” to Descon Automation Control System; SUPPLY OF SMART WATER METERS FOR AMI ROLL OUT – a five year contract.

2019

I&C Sub-Contract works for Water Supply System Upgrade : CCR141 (WR-44 & 45)

2018

Signed another Contract with FEWA to supply Smart Electronic Water Meters (Wireless)

2017

May 2017

Secured the Contract 105W for Supply of Smart electronic Water Meters to Federal Electricity & Watter Authority (FEWA)

April 2017

Received Letter Of Intent for Supply and Installation of Sector Measuring Points in Eastern Region (Abu Dhabi)Project D103593.1

2016

Descon Automation Control System LLC was chosen as System Builder and I&C contractor for new plant facilities of Lube Oil Manufacturing Company in Sharjah

2015

Conducted the Middle Eastern Service Training for Turner Designs Hydrocarbon Instruments Inc (USA) for complete dealers in the region. Training / workshop was conducted in Descon Automation Control System LLC facilities.

2014

Becoming independent entity as I&C contractor and Approved Non OEM panel builder in ADWEA Group

2013

Appointed as Distributor of Turner Designs Hydrocarbon Instruments Inc (USA)

2012

Qualified as OEM partners of ABB in RTU560 series

2011

Working together with O&G companies in tank guaging projects in Fujairah region

2010

Tank Guaging System project for El Merk Algeria along with Endress+Hauser

2009

Completing the SCADA / Gateway RTU project for Hatta Reservoir

2008

Qualified into DEWA RTU integration projects with supply of two segments of Pipeline Monitoring RTUs

2007

Taking part in Automation of “State Of the Art” Blending Facility for reputed Lube Oil Manufacturing company in Sharjah

2006

Secure the largest value Single Order Contract from FEWA in Substation Automation of 132kV Substations in Northern Emirates

2005

Qualifies as OEM Partner with ABB for RTU family in Substation Automation Domain

2004

Making an Entry into Substation Automation for 33kV Substations in Northern Emirates

2003

Selling UltraSonic Flowmeters for Crude Oil Loading Arms in Qatar

2002

Executes the PILOT project of Automatic Water Tanker Filling Station at Madinat Zayed Abu Dabi

2001

Implemented Automation of Lube Oil Blending Process with Modicon Controller and MageLis HMI

2000

Taking part in Oil & Gas segment as I&C Sub contractor

1999

Secure the Distribution Control System Contract (MEW Bahrain) outside UAE

1998

Successful in taking part of Observation and Augmentation of Water Well Head Control System in Al Ain

1997

Secures the single largest Supply Contract (WD40) for Water Network

1996

Formation of Descon Trading LLC with office in Dubai

1995

Establishing office in Abu Dhabi Emirate

1994

Descon Trading Establishment starts operation in UAE during April 1994.